The ITAC Statistics page displays the average assessment results for the selected criteria.
1
Matching Assessments
| Initial Plant Size Averages | Costs | Usage | Unit Cost | |
|---|---|---|---|---|
| All Energy | $121k | 17k |
MMBtu
|
$7.28 |
| - Electrical | $120k | 1,623k |
kWh
|
$0.074 |
| - Natural Gas | - | - |
MMBtu
|
- |
4
Recommendations
4.0
Recommendations Per Assessment
| Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
|---|---|---|---|---|
| All Energy | $29k | 2.7k |
MMBtu
|
16.0% |
| - Electrical | $17k | 259k |
kWh
|
16.0% |
| - Natural Gas | - | - |
MMBtu
|
- |
| Waste | - | |||
| Productivity/Other | - | |||
| TOTAL | $29k | |||
| *May be negative reflecting an increased cost component required to save energy and costs overall | ||||
1
with Implementation Data
| Initial Plant Size Averages | Costs | Usage | Unit Cost | |
|---|---|---|---|---|
| All Energy | $121k | 17k |
MMBtu
|
$7.28 |
| - Electrical | $120k | 1,623k |
kWh
|
$0.074 |
| - Natural Gas | - | - |
MMBtu
|
- |
0
Implemented Recommendations
0.0
Implemented Per Assessment
| Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
|---|---|---|---|---|
| All Energy | - | - |
MMBtu
|
- |
| - Electrical | - | - |
kWh
|
- |
| - Natural Gas | - | - |
MMBtu
|
- |
| Waste | - | |||
| Productivity/Other | - | |||
| TOTAL | - | |||
| *May be negative reflecting an increased cost component required to save energy and costs overall | ||||