ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Services, not elsewhere classified
3+ Characters Required for Products

9

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $413k 28k
MMBtu
$11.84
- Electrical $110k 1,674k
kWh
$0.092
- Natural Gas $5.1k 0.8k
MMBtu
$4.60

49

Recommendations

5.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $155k 0.8k
MMBtu
2.9%
- Electrical $10k 79k
kWh
4.7%
- Natural Gas $0.4k -
MMBtu
-
Waste $0.3k
Productivity/Other $1.2k
TOTAL $156k
*May be negative reflecting an increased cost component required to save energy and costs overall

8

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $101k 10k
MMBtu
$11.14
- Electrical $75k 915k
kWh
$0.097
- Natural Gas $5.7k 0.9k
MMBtu
$5.18

16

Implemented Recommendations

2.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $2.6k 0.2k
MMBtu
1.5%
- Electrical $1.7k 15k
kWh
1.7%
- Natural Gas $0.4k -
MMBtu
-
Waste $0.4k
Productivity/Other $0.0k
TOTAL $2.9k
*May be negative reflecting an increased cost component required to save energy and costs overall