Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Management and public relations services
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $253k 23k
MMBtu
$10.78
- Electrical $218k 2,140k
kWh
$0.097
- Natural Gas $9.4k 0.9k
MMBtu
$10.81

18

Recommendations

4.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $42k 4.0k
MMBtu
17.3%
- Electrical $39k 387k
kWh
18.1%
- Natural Gas $1.2k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $42k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $312k 28k
MMBtu
$11.06
- Electrical $267k 2,623k
kWh
$0.094
- Natural Gas $11k 1.1k
MMBtu
$11.51

4

Implemented Recommendations

1.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 3.0k
MMBtu
10.8%
- Electrical $32k 296k
kWh
11.3%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $34k
*May be negative reflecting an increased cost component required to save energy and costs overall