ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Testing laboratories
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $630k 56k
MMBtu
$11.57
- Electrical $300k 4,013k
kWh
$0.092
- Natural Gas $57k 8.6k
MMBtu
$7.41

45

Recommendations

6.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $104k 6.7k
MMBtu
11.9%
- Electrical $71k 653k
kWh
16.3%
- Natural Gas $14k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $104k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $630k 56k
MMBtu
$11.57
- Electrical $300k 4,013k
kWh
$0.092
- Natural Gas $57k 8.6k
MMBtu
$7.41

18

Implemented Recommendations

2.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 1.8k
MMBtu
3.1%
- Electrical $9.5k 171k
kWh
4.3%
- Natural Gas $2.1k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $17k