ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Commercial physical and biological research
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $911k 83k
MMBtu
$11.14
- Electrical $534k 5,814k
kWh
$0.091
- Natural Gas $201k 24k
MMBtu
$9.80

11

Recommendations

5.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $134k 11k
MMBtu
12.7%
- Electrical $95k 1,034k
kWh
17.8%
- Natural Gas ($-17.2)k -
MMBtu
-
Waste $7.4k
Productivity/Other ($-9.0)k
TOTAL $133k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,683k 154k
MMBtu
$10.91
- Electrical $970k 10,545k
kWh
$0.092
- Natural Gas $389k 46k
MMBtu
$8.42

5

Implemented Recommendations

5.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 2.4k
MMBtu
1.5%
- Electrical $21k 230k
kWh
2.2%
- Natural Gas $11k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $33k
*May be negative reflecting an increased cost component required to save energy and costs overall