ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Research, development, and testing services
3+ Characters Required for Products

9

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $692k 62k
MMBtu
$11.48
- Electrical $352k 4,413k
kWh
$0.092
- Natural Gas $89k 12k
MMBtu
$7.94

56

Recommendations

6.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $111k 7.6k
MMBtu
12.1%
- Electrical $77k 738k
kWh
16.7%
- Natural Gas $7.0k -
MMBtu
-
Waste $1.6k
Productivity/Other ($-2.0)k
TOTAL $111k
*May be negative reflecting an increased cost component required to save energy and costs overall

8

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $762k 69k
MMBtu
$11.49
- Electrical $384k 4,829k
kWh
$0.092
- Natural Gas $98k 13k
MMBtu
$7.53

23

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $19k 1.8k
MMBtu
2.7%
- Electrical $11k 178k
kWh
3.7%
- Natural Gas $3.2k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $19k