ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Engineering services
3+ Characters Required for Products

9

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $300k 32k
MMBtu
$10.42
- Electrical $201k 2,896k
kWh
$0.075
- Natural Gas $11k 1.8k
MMBtu
$5.97

56

Recommendations

6.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $103k 11k
MMBtu
34.7%
- Electrical $64k 1,080k
kWh
37.3%
- Natural Gas $7.2k -
MMBtu
-
Waste $0.3k
Productivity/Other $55k
TOTAL $158k
*May be negative reflecting an increased cost component required to save energy and costs overall

8

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $241k 25k
MMBtu
$10.67
- Electrical $173k 2,225k
kWh
$0.078
- Natural Gas $9.3k 1.2k
MMBtu
$6.15

17

Implemented Recommendations

2.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $11k 0.7k
MMBtu
2.8%
- Electrical $3.8k 68k
kWh
3.0%
- Natural Gas ($-2.2)k -
MMBtu
-
Waste -
Productivity/Other $61k
TOTAL $72k
*May be negative reflecting an increased cost component required to save energy and costs overall