ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Religious organizations
3+ Characters Required for Products

13

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $37k 3.0k
MMBtu
$13.54
- Electrical $23k 215k
kWh
$0.13
- Natural Gas $9.4k 0.8k
MMBtu
$106.94

58

Recommendations

4.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 1.1k
MMBtu
36.7%
- Electrical $12k 106k
kWh
49.4%
- Natural Gas $0.7k -
MMBtu
-
Waste -
Productivity/Other $0.5k
TOTAL $14k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $30k 2.2k
MMBtu
$14.43
- Electrical $19k 147k
kWh
$0.15
- Natural Gas $8.5k 0.7k
MMBtu
$148.35

9

Implemented Recommendations

1.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $0.5k 0.0k
MMBtu
1.1%
- Electrical $0.3k 2.3k
kWh
1.6%
- Natural Gas $0.0k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $0.5k