ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Religious organizations
3+ Characters Required for Products

14

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $50k 4.0k
MMBtu
$13.48
- Electrical $34k 292k
kWh
$0.13
- Natural Gas $12k 1.0k
MMBtu
$100.00

62

Recommendations

4.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 1.8k
MMBtu
45.2%
- Electrical $22k 176k
kWh
60.3%
- Natural Gas $1.3k -
MMBtu
-
Waste -
Productivity/Other $0.4k
TOTAL $24k
*May be negative reflecting an increased cost component required to save energy and costs overall

10

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $32k 2.5k
MMBtu
$14.11
- Electrical $21k 169k
kWh
$0.14
- Natural Gas $8.8k 0.7k
MMBtu
$134.95

11

Implemented Recommendations

1.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $2.4k 0.2k
MMBtu
8.4%
- Electrical $2.2k 20k
kWh
12.0%
- Natural Gas $0.1k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $2.4k
*May be negative reflecting an increased cost component required to save energy and costs overall