The ITAC Statistics page displays the average assessment results for the selected criteria.
16
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $42k | 3.9k |
MMBtu
|
$12.44 |
- Electrical | $29k | 319k |
kWh
|
$0.12 |
- Natural Gas | $6.6k | 0.6k |
MMBtu
|
$85.64 |
68
Recommendations
4.3
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $13k | 1.3k |
MMBtu
|
33.6% |
- Electrical | $12k | 126k |
kWh
|
39.5% |
- Natural Gas | $0.2k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $0.4k | |||
TOTAL | $13k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
8
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $47k | 4.4k |
MMBtu
|
$11.85 |
- Electrical | $36k | 365k |
kWh
|
$0.13 |
- Natural Gas | $8.2k | 0.6k |
MMBtu
|
$162.52 |
12
Implemented Recommendations
1.5
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $4.4k | 0.5k |
MMBtu
|
10.9% |
- Electrical | $4.1k | 46k |
kWh
|
12.7% |
- Natural Gas | $0.0k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | - | |||
TOTAL | $4.4k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |