Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Membership organizations
3+ Characters Required for Products

12

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $48k 4.5k
MMBtu
$11.47
- Electrical $34k 384k
kWh
$0.12
- Natural Gas $7.2k 0.6k
MMBtu
$111.01

45

Recommendations

3.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $14k 1.4k
MMBtu
31.4%
- Electrical $13k 139k
kWh
36.2%
- Natural Gas $0.2k -
MMBtu
-
Waste -
Productivity/Other $0.2k
TOTAL $14k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $51k 4.2k
MMBtu
$13.76
- Electrical $38k 354k
kWh
$0.13
- Natural Gas $10k 0.6k
MMBtu
$321.25

6

Implemented Recommendations

1.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $6.5k 0.7k
MMBtu
17.4%
- Electrical $6.2k 72k
kWh
20.3%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $6.5k