ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Membership organizations
3+ Characters Required for Products

16

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $42k 3.9k
MMBtu
$12.44
- Electrical $29k 319k
kWh
$0.12
- Natural Gas $6.6k 0.6k
MMBtu
$85.64

68

Recommendations

4.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 1.3k
MMBtu
33.6%
- Electrical $12k 126k
kWh
39.5%
- Natural Gas $0.2k -
MMBtu
-
Waste -
Productivity/Other $0.4k
TOTAL $13k
*May be negative reflecting an increased cost component required to save energy and costs overall

8

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $47k 4.4k
MMBtu
$11.85
- Electrical $36k 365k
kWh
$0.13
- Natural Gas $8.2k 0.6k
MMBtu
$162.52

12

Implemented Recommendations

1.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $4.4k 0.5k
MMBtu
10.9%
- Electrical $4.1k 46k
kWh
12.7%
- Natural Gas $0.0k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $4.4k
*May be negative reflecting an increased cost component required to save energy and costs overall