The ITAC Statistics page displays the average assessment results for the selected criteria.
5
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $290k | 42k |
MMBtu
|
$8.78 |
- Electrical | $204k | 3,142k |
kWh
|
$0.095 |
- Natural Gas | $56k | 10k |
MMBtu
|
$4.87 |
34
Recommendations
6.8
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $26k | 2.5k |
MMBtu
|
6.0% |
- Electrical | $17k | 247k |
kWh
|
7.9% |
- Natural Gas | $7.6k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $0.3k | |||
TOTAL | $26k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
5
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $290k | 42k |
MMBtu
|
$8.78 |
- Electrical | $204k | 3,142k |
kWh
|
$0.095 |
- Natural Gas | $56k | 10k |
MMBtu
|
$4.87 |
23
Implemented Recommendations
4.6
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $18k | 1.4k |
MMBtu
|
3.4% |
- Electrical | $11k | 140k |
kWh
|
4.5% |
- Natural Gas | $7.4k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $0.2k | |||
TOTAL | $18k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |