ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Social services, not elsewhere classified
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $113k 9.5k
MMBtu
$12.47
- Electrical $59k 841k
kWh
$0.076
- Natural Gas $7.7k 0.9k
MMBtu
$3.75

27

Recommendations

6.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 0.8k
MMBtu
8.7%
- Electrical $5.8k 80k
kWh
9.5%
- Natural Gas $18k -
MMBtu
-
Waste -
Productivity/Other $0.9k
TOTAL $24k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $117k 9.8k
MMBtu
$12.64
- Electrical $50k 872k
kWh
$0.064
- Natural Gas $9.0k 0.8k
MMBtu
$3.58

7

Implemented Recommendations

2.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 0.5k
MMBtu
5.4%
- Electrical $3.3k 51k
kWh
5.9%
- Natural Gas $20k -
MMBtu
-
Waste -
Productivity/Other $1.1k
TOTAL $23k