ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Social services
3+ Characters Required for Products

13

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $115k 7.5k
MMBtu
$14.63
- Electrical $88k 641k
kWh
$0.12
- Natural Gas $7.7k 0.9k
MMBtu
$5.06

77

Recommendations

5.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $51k 2.4k
MMBtu
31.5%
- Electrical $43k 230k
kWh
35.9%
- Natural Gas $6.2k -
MMBtu
-
Waste -
Productivity/Other $1.3k
TOTAL $52k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $71k 6.3k
MMBtu
$12.19
- Electrical $39k 512k
kWh
$0.087
- Natural Gas $10k 1.1k
MMBtu
$6.06

23

Implemented Recommendations

2.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 0.9k
MMBtu
14.0%
- Electrical $7.9k 86k
kWh
16.9%
- Natural Gas $7.4k -
MMBtu
-
Waste -
Productivity/Other $0.4k
TOTAL $16k
*May be negative reflecting an increased cost component required to save energy and costs overall