ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Social services
3+ Characters Required for Products

19

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $114k 7.8k
MMBtu
$14.16
- Electrical $79k 627k
kWh
$0.11
- Natural Gas $9.4k 1.2k
MMBtu
$5.14

117

Recommendations

6.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $46k 2.5k
MMBtu
32.2%
- Electrical $39k 244k
kWh
38.8%
- Natural Gas $4.6k -
MMBtu
-
Waste -
Productivity/Other $1.3k
TOTAL $47k
*May be negative reflecting an increased cost component required to save energy and costs overall

10

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $74k 6.5k
MMBtu
$12.16
- Electrical $43k 536k
kWh
$0.089
- Natural Gas $9.7k 1.1k
MMBtu
$5.88

30

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $15k 0.8k
MMBtu
12.8%
- Electrical $7.6k 82k
kWh
15.3%
- Natural Gas $7.0k -
MMBtu
-
Waste -
Productivity/Other $0.4k
TOTAL $16k
*May be negative reflecting an increased cost component required to save energy and costs overall