ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Junior colleges and technical institutes
3+ Characters Required for Products

12

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $182k 27k
MMBtu
$7.41
- Electrical $108k 2,003k
kWh
$0.057
- Natural Gas $36k 6.2k
MMBtu
$6.55

57

Recommendations

4.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $26k 2.5k
MMBtu
9.5%
- Electrical $15k 247k
kWh
12.4%
- Natural Gas $8.9k -
MMBtu
-
Waste $0.2k
Productivity/Other $1.9k
TOTAL $28k
*May be negative reflecting an increased cost component required to save energy and costs overall

11

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $185k 28k
MMBtu
$7.16
- Electrical $104k 2,054k
kWh
$0.052
- Natural Gas $39k 6.8k
MMBtu
$7.15

13

Implemented Recommendations

1.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $6.3k 0.8k
MMBtu
2.9%
- Electrical $2.7k 79k
kWh
3.8%
- Natural Gas $1.7k -
MMBtu
-
Waste $0.2k
Productivity/Other $2.0k
TOTAL $8.5k
*May be negative reflecting an increased cost component required to save energy and costs overall