ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Colleges, universities, and professional schools
3+ Characters Required for Products

33

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $187k 25k
MMBtu
$9.56
- Electrical $83k 1,317k
kWh
$0.085
- Natural Gas $33k 7.4k
MMBtu
$4.81

179

Recommendations

5.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 2.8k
MMBtu
11.0%
- Electrical $17k 270k
kWh
20.5%
- Natural Gas $4.7k -
MMBtu
-
Waste $0.6k
Productivity/Other $4.6k
TOTAL $38k
*May be negative reflecting an increased cost component required to save energy and costs overall

26

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $192k 27k
MMBtu
$9.36
- Electrical $88k 1,400k
kWh
$0.076
- Natural Gas $38k 7.8k
MMBtu
$5.07

56

Implemented Recommendations

2.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 0.8k
MMBtu
3.1%
- Electrical $5.1k 83k
kWh
5.9%
- Natural Gas $2.3k -
MMBtu
-
Waste $0.8k
Productivity/Other $5.8k
TOTAL $23k
*May be negative reflecting an increased cost component required to save energy and costs overall