ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Colleges, universities, and professional schools
3+ Characters Required for Products

33

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $186k 25k
MMBtu
$9.53
- Electrical $83k 1,317k
kWh
$0.085
- Natural Gas $33k 7.4k
MMBtu
$4.81

179

Recommendations

5.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 2.8k
MMBtu
11.0%
- Electrical $17k 270k
kWh
20.5%
- Natural Gas $4.7k -
MMBtu
-
Waste $0.6k
Productivity/Other $4.6k
TOTAL $38k
*May be negative reflecting an increased cost component required to save energy and costs overall

24

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $197k 28k
MMBtu
$9.08
- Electrical $90k 1,398k
kWh
$0.077
- Natural Gas $40k 8.4k
MMBtu
$5.17

53

Implemented Recommendations

2.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 0.9k
MMBtu
3.2%
- Electrical $5.3k 87k
kWh
6.2%
- Natural Gas $2.5k -
MMBtu
-
Waste $0.9k
Productivity/Other $6.3k
TOTAL $24k
*May be negative reflecting an increased cost component required to save energy and costs overall