The ITAC Statistics page displays the average assessment results for the selected criteria.
27
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $207k | 31k |
MMBtu
|
$8.04 |
- Electrical | $102k | 1,766k |
kWh
|
$0.060 |
- Natural Gas | $42k | 8.5k |
MMBtu
|
$5.23 |
130
Recommendations
4.8
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $29k | 2.2k |
MMBtu
|
7.1% |
- Electrical | $14k | 215k |
kWh
|
12.2% |
- Natural Gas | $6.9k | - |
MMBtu
|
- |
Waste | $0.8k | |||
Productivity/Other | $6.4k | |||
TOTAL | $36k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
16
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $255k | 42k |
MMBtu
|
$7.24 |
- Electrical | $114k | 2,161k |
kWh
|
$0.057 |
- Natural Gas | $58k | 12k |
MMBtu
|
$5.68 |
27
Implemented Recommendations
1.7
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $21k | 1.0k |
MMBtu
|
2.4% |
- Electrical | $5.7k | 99k |
kWh
|
4.6% |
- Natural Gas | $3.6k | - |
MMBtu
|
- |
Waste | $1.4k | |||
Productivity/Other | $9.5k | |||
TOTAL | $32k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |