The ITAC Statistics page displays the average assessment results for the selected criteria.
31
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $197k | 30k |
MMBtu
|
$8.13 |
- Electrical | $95k | 1,586k |
kWh
|
$0.081 |
- Natural Gas | $44k | 9.4k |
MMBtu
|
$5.07 |
156
Recommendations
5.0
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $31k | 2.1k |
MMBtu
|
7.0% |
- Electrical | $15k | 202k |
kWh
|
12.8% |
- Natural Gas | $8.0k | - |
MMBtu
|
- |
Waste | $0.7k | |||
Productivity/Other | $5.6k | |||
TOTAL | $37k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
27
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $207k | 31k |
MMBtu
|
$8.04 |
- Electrical | $102k | 1,766k |
kWh
|
$0.060 |
- Natural Gas | $42k | 8.5k |
MMBtu
|
$5.23 |
39
Implemented Recommendations
1.4
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $15k | 0.9k |
MMBtu
|
2.9% |
- Electrical | $5.3k | 87k |
kWh
|
4.9% |
- Natural Gas | $2.2k | - |
MMBtu
|
- |
Waste | $0.8k | |||
Productivity/Other | $6.5k | |||
TOTAL | $22k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |