ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Elementary and secondary schools
3+ Characters Required for Products

79

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $135k 13k
MMBtu
$11.40
- Electrical $87k 1,045k
kWh
$0.085
- Natural Gas $17k 2.2k
MMBtu
$6.60

417

Recommendations

5.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 4.1k
MMBtu
31.6%
- Electrical $33k 399k
kWh
38.2%
- Natural Gas $1.5k -
MMBtu
-
Waste $0.2k
Productivity/Other $1.6k
TOTAL $42k
*May be negative reflecting an increased cost component required to save energy and costs overall

35

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $164k 17k
MMBtu
$11.43
- Electrical $116k 1,268k
kWh
$0.10
- Natural Gas $24k 3.4k
MMBtu
$4.02

111

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 2.0k
MMBtu
12.4%
- Electrical $18k 199k
kWh
15.7%
- Natural Gas $0.9k -
MMBtu
-
Waste $0.0k
Productivity/Other $0.2k
TOTAL $23k
*May be negative reflecting an increased cost component required to save energy and costs overall