ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Elementary and secondary schools
3+ Characters Required for Products

59

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $148k 14k
MMBtu
$12.19
- Electrical $91k 1,049k
kWh
$0.092
- Natural Gas $22k 2.7k
MMBtu
$6.79

325

Recommendations

5.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 4.3k
MMBtu
31.6%
- Electrical $36k 417k
kWh
39.8%
- Natural Gas $1.8k -
MMBtu
-
Waste $0.2k
Productivity/Other $2.1k
TOTAL $47k
*May be negative reflecting an increased cost component required to save energy and costs overall

28

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $163k 17k
MMBtu
$10.86
- Electrical $119k 1,389k
kWh
$0.095
- Natural Gas $21k 2.7k
MMBtu
$4.22

90

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 2.2k
MMBtu
13.1%
- Electrical $18k 217k
kWh
15.6%
- Natural Gas $1.0k -
MMBtu
-
Waste $0.0k
Productivity/Other $0.3k
TOTAL $23k