ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Elementary and secondary schools
3+ Characters Required for Products

65

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $139k 13k
MMBtu
$11.79
- Electrical $86k 1,009k
kWh
$0.088
- Natural Gas $20k 2.5k
MMBtu
$6.69

350

Recommendations

5.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 4.3k
MMBtu
33.6%
- Electrical $35k 423k
kWh
41.9%
- Natural Gas $1.6k -
MMBtu
-
Waste $0.2k
Productivity/Other $1.9k
TOTAL $45k
*May be negative reflecting an increased cost component required to save energy and costs overall

29

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $168k 17k
MMBtu
$10.96
- Electrical $118k 1,377k
kWh
$0.095
- Natural Gas $23k 3.0k
MMBtu
$4.37

94

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 2.3k
MMBtu
13.3%
- Electrical $19k 222k
kWh
16.1%
- Natural Gas $1.0k -
MMBtu
-
Waste $0.0k
Productivity/Other $0.3k
TOTAL $24k
*May be negative reflecting an increased cost component required to save energy and costs overall