ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Educational services
3+ Characters Required for Products

117

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $153k 17k
MMBtu
$10.56
- Electrical $85k 1,154k
kWh
$0.086
- Natural Gas $25k 4.1k
MMBtu
$6.31

610

Recommendations

5.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $37k 3.5k
MMBtu
20.1%
- Electrical $27k 338k
kWh
29.3%
- Natural Gas $3.3k -
MMBtu
-
Waste $0.3k
Productivity/Other $2.7k
TOTAL $40k
*May be negative reflecting an increased cost component required to save energy and costs overall

67

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $188k 23k
MMBtu
$9.93
- Electrical $108k 1,483k
kWh
$0.084
- Natural Gas $31k 5.5k
MMBtu
$4.91

161

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $19k 1.6k
MMBtu
6.9%
- Electrical $12k 154k
kWh
10.4%
- Natural Gas $1.5k -
MMBtu
-
Waste $0.4k
Productivity/Other $2.9k
TOTAL $22k