ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Educational services
3+ Characters Required for Products

95

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $166k 19k
MMBtu
$10.90
- Electrical $92k 1,246k
kWh
$0.084
- Natural Gas $27k 4.3k
MMBtu
$6.56

498

Recommendations

5.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $39k 3.5k
MMBtu
18.9%
- Electrical $28k 344k
kWh
27.6%
- Natural Gas $3.3k -
MMBtu
-
Waste $0.4k
Productivity/Other $3.3k
TOTAL $42k
*May be negative reflecting an increased cost component required to save energy and costs overall

50

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $199k 25k
MMBtu
$9.60
- Electrical $112k 1,624k
kWh
$0.081
- Natural Gas $32k 5.8k
MMBtu
$5.13

132

Implemented Recommendations

2.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 1.8k
MMBtu
7.1%
- Electrical $13k 177k
kWh
10.9%
- Natural Gas $1.9k -
MMBtu
-
Waste $0.5k
Productivity/Other $3.4k
TOTAL $25k
*May be negative reflecting an increased cost component required to save energy and costs overall