ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Educational services
3+ Characters Required for Products

140

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $152k 17k
MMBtu
$10.84
- Electrical $86k 1,164k
kWh
$0.085
- Natural Gas $23k 3.7k
MMBtu
$6.67

715

Recommendations

5.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $40k 3.6k
MMBtu
21.2%
- Electrical $29k 347k
kWh
29.9%
- Natural Gas $3.1k -
MMBtu
-
Waste $1.0k
Productivity/Other $2.3k
TOTAL $43k
*May be negative reflecting an increased cost component required to save energy and costs overall

86

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $178k 21k
MMBtu
$10.13
- Electrical $105k 1,397k
kWh
$0.090
- Natural Gas $28k 4.9k
MMBtu
$4.79

212

Implemented Recommendations

2.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 1.4k
MMBtu
6.7%
- Electrical $11k 138k
kWh
9.9%
- Natural Gas $1.5k -
MMBtu
-
Waste $0.3k
Productivity/Other $2.3k
TOTAL $19k
*May be negative reflecting an increased cost component required to save energy and costs overall