ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Legal services
3+ Characters Required for Products

6

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $80k 7.0k
MMBtu
$13.25
- Electrical $34k 543k
kWh
$0.071
- Natural Gas $12k 1.4k
MMBtu
$10.12

31

Recommendations

5.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $11k 1.3k
MMBtu
19.1%
- Electrical $7.1k 130k
kWh
24.0%
- Natural Gas $2.4k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $11k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $77k 5.8k
MMBtu
$14.41
- Electrical $34k 453k
kWh
$0.078
- Natural Gas $13k 1.1k
MMBtu
$11.49

3

Implemented Recommendations

0.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $1.3k 0.1k
MMBtu
2.1%
- Electrical $0.7k 12k
kWh
2.6%
- Natural Gas $0.6k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $1.3k
*May be negative reflecting an increased cost component required to save energy and costs overall