The ITAC Statistics page displays the average assessment results for the selected criteria.
5
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $77k | 5.8k |
MMBtu
|
$14.41 |
- Electrical | $34k | 453k |
kWh
|
$0.078 |
- Natural Gas | $13k | 1.1k |
MMBtu
|
$11.49 |
26
Recommendations
5.2
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $9.2k | 0.9k |
MMBtu
|
16.4% |
- Electrical | $6.3k | 92k |
kWh
|
20.4% |
- Natural Gas | $2.5k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | - | |||
TOTAL | $9.2k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
5
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $77k | 5.8k |
MMBtu
|
$14.41 |
- Electrical | $34k | 453k |
kWh
|
$0.078 |
- Natural Gas | $13k | 1.1k |
MMBtu
|
$11.49 |
3
Implemented Recommendations
0.6
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $1.3k | 0.1k |
MMBtu
|
2.1% |
- Electrical | $0.7k | 12k |
kWh
|
2.6% |
- Natural Gas | $0.6k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | - | |||
TOTAL | $1.3k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |