ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Legal services
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $77k 5.8k
MMBtu
$14.41
- Electrical $34k 453k
kWh
$0.078
- Natural Gas $13k 1.1k
MMBtu
$11.49

26

Recommendations

5.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $9.2k 0.9k
MMBtu
16.4%
- Electrical $6.3k 92k
kWh
20.4%
- Natural Gas $2.5k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $9.2k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $83k 6.3k
MMBtu
$14.49
- Electrical $39k 516k
kWh
$0.080
- Natural Gas $11k 1.0k
MMBtu
$11.35

3

Implemented Recommendations

0.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $1.6k 0.2k
MMBtu
2.4%
- Electrical $0.9k 15k
kWh
2.9%
- Natural Gas $0.8k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $1.6k
*May be negative reflecting an increased cost component required to save energy and costs overall