ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Specialty outpatient facilities, not elsewhere classified
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $252k 30k
MMBtu
$8.39
- Electrical $140k 2,286k
kWh
$0.065
- Natural Gas $32k 6.4k
MMBtu
$8.10

13

Recommendations

4.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $49k 5.1k
MMBtu
16.9%
- Electrical $26k 494k
kWh
21.6%
- Natural Gas $8.6k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $49k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $252k 30k
MMBtu
$8.39
- Electrical $140k 2,286k
kWh
$0.065
- Natural Gas $32k 6.4k
MMBtu
$8.10

8

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 1.5k
MMBtu
5.0%
- Electrical $6.9k 147k
kWh
6.4%
- Natural Gas $8.6k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $25k
*May be negative reflecting an increased cost component required to save energy and costs overall