ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Specialty outpatient facilities, not elsewhere classified
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $252k 30k
MMBtu
$8.39
- Electrical $140k 2,286k
kWh
$0.065
- Natural Gas $32k 6.4k
MMBtu
$8.10

15

Recommendations

5.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $61k 1.1k
MMBtu
3.7%
- Electrical $21k 108k
kWh
4.7%
- Natural Gas $43k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $61k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $165k 19k
MMBtu
$8.56
- Electrical $151k 1,781k
kWh
$0.079
- Natural Gas $0.8k 0.0k
MMBtu
$9.65

5

Implemented Recommendations

2.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $7.9k 0.6k
MMBtu
3.1%
- Electrical $4.5k 57k
kWh
3.2%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $7.9k
*May be negative reflecting an increased cost component required to save energy and costs overall