ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous health and allied services, not
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $288k 36k
MMBtu
$8.09
- Electrical $180k 2,886k
kWh
$0.065
- Natural Gas $38k 6.6k
MMBtu
$8.03

23

Recommendations

5.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $50k 4.8k
MMBtu
13.3%
- Electrical $26k 470k
kWh
16.3%
- Natural Gas $9.0k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $50k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $288k 36k
MMBtu
$8.09
- Electrical $180k 2,886k
kWh
$0.065
- Natural Gas $38k 6.6k
MMBtu
$8.03

10

Implemented Recommendations

2.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $20k 1.3k
MMBtu
3.7%
- Electrical $6.5k 131k
kWh
4.5%
- Natural Gas $6.5k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $20k
*May be negative reflecting an increased cost component required to save energy and costs overall