ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC General medical and surgical hospitals
3+ Characters Required for Products

15

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $890k 104k
MMBtu
$9.33
- Electrical $562k 7,701k
kWh
$0.082
- Natural Gas $138k 24k
MMBtu
$4.87

103

Recommendations

6.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $159k 17k
MMBtu
16.4%
- Electrical $183k 1,661k
kWh
21.6%
- Natural Gas $26k -
MMBtu
-
Waste -
Productivity/Other ($-1.3)k
TOTAL $158k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $808k 95k
MMBtu
$10.01
- Electrical $556k 6,805k
kWh
$0.092
- Natural Gas $140k 25k
MMBtu
$4.16

31

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $50k 5.2k
MMBtu
5.5%
- Electrical $43k 507k
kWh
7.5%
- Natural Gas $3.9k -
MMBtu
-
Waste -
Productivity/Other $0.6k
TOTAL $51k
*May be negative reflecting an increased cost component required to save energy and costs overall