ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Offices and clinics of doctors of osteopathy
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $425k 50k
MMBtu
$8.47
- Electrical $279k 3,586k
kWh
$0.078
- Natural Gas $118k 13k
MMBtu
$8.83

3

Recommendations

3.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 2.8k
MMBtu
5.6%
- Electrical $21k 274k
kWh
7.6%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $22k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $425k 50k
MMBtu
$8.47
- Electrical $279k 3,586k
kWh
$0.078
- Natural Gas $118k 13k
MMBtu
$8.83

3

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 2.8k
MMBtu
5.6%
- Electrical $21k 274k
kWh
7.6%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $22k
*May be negative reflecting an increased cost component required to save energy and costs overall