The ITAC Statistics page displays the average assessment results for the selected criteria.
1
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $425k | 50k |
MMBtu
|
$8.47 |
- Electrical | $279k | 3,586k |
kWh
|
$0.078 |
- Natural Gas | $118k | 13k |
MMBtu
|
$8.83 |
3
Recommendations
3.0
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $22k | 2.8k |
MMBtu
|
5.6% |
- Electrical | $21k | 274k |
kWh
|
7.6% |
- Natural Gas | - | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | - | |||
TOTAL | $22k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
1
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $425k | 50k |
MMBtu
|
$8.47 |
- Electrical | $279k | 3,586k |
kWh
|
$0.078 |
- Natural Gas | $118k | 13k |
MMBtu
|
$8.83 |
3
Implemented Recommendations
3.0
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $22k | 2.8k |
MMBtu
|
5.6% |
- Electrical | $21k | 274k |
kWh
|
7.6% |
- Natural Gas | - | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | - | |||
TOTAL | $22k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |