ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Offices and clinics of doctors of medicine
3+ Characters Required for Products

6

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $147k 15k
MMBtu
$9.74
- Electrical $53k 1,149k
kWh
$0.064
- Natural Gas $52k 2.8k
MMBtu
$6.85

30

Recommendations

5.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 2.8k
MMBtu
18.9%
- Electrical $18k 270k
kWh
23.5%
- Natural Gas $1.1k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $24k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $146k 13k
MMBtu
$10.27
- Electrical $48k 963k
kWh
$0.069
- Natural Gas $62k 3.3k
MMBtu
$8.21

17

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $15k 1.5k
MMBtu
10.9%
- Electrical $14k 142k
kWh
14.8%
- Natural Gas $0.6k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $15k
*May be negative reflecting an increased cost component required to save energy and costs overall