ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Health services
3+ Characters Required for Products

28

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $586k 67k
MMBtu
$9.49
- Electrical $372k 5,090k
kWh
$0.079
- Natural Gas $95k 15k
MMBtu
$5.59

169

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $102k 11k
MMBtu
16.3%
- Electrical $112k 1,070k
kWh
21.0%
- Natural Gas $15k -
MMBtu
-
Waste -
Productivity/Other ($-0.7)k
TOTAL $102k
*May be negative reflecting an increased cost component required to save energy and costs overall

18

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $547k 63k
MMBtu
$9.48
- Electrical $371k 4,633k
kWh
$0.083
- Natural Gas $103k 15k
MMBtu
$6.21

52

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 3.3k
MMBtu
5.2%
- Electrical $27k 320k
kWh
6.9%
- Natural Gas $2.0k -
MMBtu
-
Waste -
Productivity/Other $0.3k
TOTAL $32k
*May be negative reflecting an increased cost component required to save energy and costs overall