ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous amusement and recreation
3+ Characters Required for Products

15

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $385k 47k
MMBtu
$9.84
- Electrical $299k 4,109k
kWh
$0.076
- Natural Gas $24k 4.9k
MMBtu
$6.40

76

Recommendations

5.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 4.4k
MMBtu
9.3%
- Electrical $35k 426k
kWh
10.4%
- Natural Gas $3.5k -
MMBtu
-
Waste $0.3k
Productivity/Other $0.0k
TOTAL $45k
*May be negative reflecting an increased cost component required to save energy and costs overall

10

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $530k 66k
MMBtu
$9.54
- Electrical $417k 5,727k
kWh
$0.076
- Natural Gas $32k 6.9k
MMBtu
$5.23

33

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 2.2k
MMBtu
3.4%
- Electrical $19k 219k
kWh
3.8%
- Natural Gas $1.4k -
MMBtu
-
Waste -
Productivity/Other ($0.0)k
TOTAL $28k
*May be negative reflecting an increased cost component required to save energy and costs overall