ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous amusement and recreation
3+ Characters Required for Products

26

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $290k 35k
MMBtu
$9.77
- Electrical $217k 2,949k
kWh
$0.081
- Natural Gas $29k 4.9k
MMBtu
$6.73

129

Recommendations

5.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $46k 4.3k
MMBtu
12.1%
- Electrical $37k 416k
kWh
14.1%
- Natural Gas $6.0k -
MMBtu
-
Waste $0.2k
Productivity/Other $0.4k
TOTAL $47k
*May be negative reflecting an increased cost component required to save energy and costs overall

19

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $339k 42k
MMBtu
$9.53
- Electrical $261k 3,671k
kWh
$0.071
- Natural Gas $24k 4.5k
MMBtu
$6.71

51

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 1.6k
MMBtu
3.8%
- Electrical $12k 155k
kWh
4.2%
- Natural Gas $0.8k -
MMBtu
-
Waste -
Productivity/Other ($0.0)k
TOTAL $17k
*May be negative reflecting an increased cost component required to save energy and costs overall