The ITAC Statistics page displays the average assessment results for the selected criteria.
12
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $459k | 56k |
MMBtu
|
$10.05 |
- Electrical | $359k | 4,894k |
kWh
|
$0.077 |
- Natural Gas | $28k | 6.0k |
MMBtu
|
$5.96 |
64
Recommendations
5.3
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $53k | 5.0k |
MMBtu
|
9.0% |
- Electrical | $41k | 493k |
kWh
|
10.1% |
- Natural Gas | $4.3k | - |
MMBtu
|
- |
Waste | $0.4k | |||
Productivity/Other | $0.0k | |||
TOTAL | $54k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
8
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $632k | 79k |
MMBtu
|
$9.04 |
- Electrical | $513k | 6,998k |
kWh
|
$0.076 |
- Natural Gas | $27k | 6.9k |
MMBtu
|
$4.17 |
28
Implemented Recommendations
3.5
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $28k | 2.7k |
MMBtu
|
3.4% |
- Electrical | $22k | 261k |
kWh
|
3.7% |
- Natural Gas | $1.1k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | ($-0.1)k | |||
TOTAL | $28k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |