ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Amusement and recreation services
3+ Characters Required for Products

27

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $289k 34k
MMBtu
$10.22
- Electrical $207k 2,852k
kWh
$0.083
- Natural Gas $35k 5.1k
MMBtu
$6.71

134

Recommendations

5.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $37k 3.4k
MMBtu
9.9%
- Electrical $26k 332k
kWh
11.6%
- Natural Gas $6.5k -
MMBtu
-
Waste $0.2k
Productivity/Other $0.5k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall

21

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $337k 40k
MMBtu
$10.05
- Electrical $249k 3,454k
kWh
$0.082
- Natural Gas $35k 5.1k
MMBtu
$6.77

54

Implemented Recommendations

2.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 1.5k
MMBtu
3.8%
- Electrical $12k 151k
kWh
4.4%
- Natural Gas $0.7k -
MMBtu
-
Waste -
Productivity/Other ($0.0)k
TOTAL $17k
*May be negative reflecting an increased cost component required to save energy and costs overall