ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Amusement and recreation services
3+ Characters Required for Products

18

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $363k 43k
MMBtu
$10.73
- Electrical $265k 3,600k
kWh
$0.087
- Natural Gas $38k 5.6k
MMBtu
$6.74

90

Recommendations

5.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $42k 3.9k
MMBtu
9.2%
- Electrical $32k 379k
kWh
10.5%
- Natural Gas $4.9k -
MMBtu
-
Waste $0.3k
Productivity/Other $0.1k
TOTAL $42k
*May be negative reflecting an increased cost component required to save energy and costs overall

12

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $450k 55k
MMBtu
$10.39
- Electrical $354k 4,836k
kWh
$0.090
- Natural Gas $27k 5.8k
MMBtu
$5.44

37

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.1k
MMBtu
3.7%
- Electrical $17k 201k
kWh
4.1%
- Natural Gas $1.2k -
MMBtu
-
Waste -
Productivity/Other ($0.0)k
TOTAL $25k
*May be negative reflecting an increased cost component required to save energy and costs overall