ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Amusement and recreation services
3+ Characters Required for Products

15

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $383k 46k
MMBtu
$10.67
- Electrical $297k 4,033k
kWh
$0.087
- Natural Gas $25k 5.1k
MMBtu
$6.00

77

Recommendations

5.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $46k 4.3k
MMBtu
9.4%
- Electrical $36k 424k
kWh
10.5%
- Natural Gas $3.5k -
MMBtu
-
Waste $0.3k
Productivity/Other $0.1k
TOTAL $46k
*May be negative reflecting an increased cost component required to save energy and costs overall

10

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $515k 64k
MMBtu
$10.17
- Electrical $418k 5,674k
kWh
$0.093
- Natural Gas $22k 5.5k
MMBtu
$4.64

32

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.4k
MMBtu
3.7%
- Electrical $20k 231k
kWh
4.1%
- Natural Gas $0.9k -
MMBtu
-
Waste -
Productivity/Other ($0.0)k
TOTAL $25k