ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Amusement and recreation services
3+ Characters Required for Products

19

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $346k 41k
MMBtu
$10.52
- Electrical $253k 3,450k
kWh
$0.085
- Natural Gas $36k 5.3k
MMBtu
$6.71

95

Recommendations

5.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $40k 3.8k
MMBtu
9.3%
- Electrical $30k 367k
kWh
10.6%
- Natural Gas $4.6k -
MMBtu
-
Waste $0.2k
Productivity/Other $0.1k
TOTAL $41k
*May be negative reflecting an increased cost component required to save energy and costs overall

12

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $450k 55k
MMBtu
$10.39
- Electrical $354k 4,836k
kWh
$0.090
- Natural Gas $27k 5.8k
MMBtu
$5.44

37

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.1k
MMBtu
3.7%
- Electrical $17k 201k
kWh
4.1%
- Natural Gas $1.2k -
MMBtu
-
Waste -
Productivity/Other ($0.0)k
TOTAL $25k
*May be negative reflecting an increased cost component required to save energy and costs overall