The ITAC Statistics page displays the average assessment results for the selected criteria.
18
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $363k | 43k |
MMBtu
|
$10.73 |
- Electrical | $265k | 3,600k |
kWh
|
$0.087 |
- Natural Gas | $38k | 5.6k |
MMBtu
|
$6.74 |
90
Recommendations
5.0
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $42k | 3.9k |
MMBtu
|
9.2% |
- Electrical | $32k | 379k |
kWh
|
10.5% |
- Natural Gas | $4.9k | - |
MMBtu
|
- |
Waste | $0.3k | |||
Productivity/Other | $0.1k | |||
TOTAL | $42k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
12
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $450k | 55k |
MMBtu
|
$10.39 |
- Electrical | $354k | 4,836k |
kWh
|
$0.090 |
- Natural Gas | $27k | 5.8k |
MMBtu
|
$5.44 |
37
Implemented Recommendations
3.1
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $25k | 2.1k |
MMBtu
|
3.7% |
- Electrical | $17k | 201k |
kWh
|
4.1% |
- Natural Gas | $1.2k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | ($0.0)k | |||
TOTAL | $25k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |