ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Amusement and recreation services
3+ Characters Required for Products

21

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $338k 40k
MMBtu
$10.20
- Electrical $247k 3,423k
kWh
$0.082
- Natural Gas $36k 5.2k
MMBtu
$6.78

105

Recommendations

5.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 4.0k
MMBtu
10.0%
- Electrical $31k 392k
kWh
11.5%
- Natural Gas $5.1k -
MMBtu
-
Waste $0.2k
Productivity/Other $0.6k
TOTAL $42k
*May be negative reflecting an increased cost component required to save energy and costs overall

13

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $417k 51k
MMBtu
$10.65
- Electrical $328k 4,476k
kWh
$0.088
- Natural Gas $25k 5.4k
MMBtu
$5.93

37

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 1.9k
MMBtu
3.7%
- Electrical $16k 185k
kWh
4.1%
- Natural Gas $1.1k -
MMBtu
-
Waste -
Productivity/Other ($0.0)k
TOTAL $23k
*May be negative reflecting an increased cost component required to save energy and costs overall