ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Amusement and recreation services
3+ Characters Required for Products

24

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $304k 36k
MMBtu
$10.34
- Electrical $222k 3,078k
kWh
$0.082
- Natural Gas $32k 4.6k
MMBtu
$6.62

120

Recommendations

5.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $37k 3.7k
MMBtu
10.3%
- Electrical $28k 363k
kWh
11.8%
- Natural Gas $4.4k -
MMBtu
-
Waste $0.2k
Productivity/Other $0.5k
TOTAL $38k
*May be negative reflecting an increased cost component required to save energy and costs overall

20

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $348k 42k
MMBtu
$10.21
- Electrical $256k 3,544k
kWh
$0.082
- Natural Gas $37k 5.3k
MMBtu
$6.84

43

Implemented Recommendations

2.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 1.3k
MMBtu
3.2%
- Electrical $11k 131k
kWh
3.7%
- Natural Gas $0.8k -
MMBtu
-
Waste -
Productivity/Other ($0.0)k
TOTAL $16k
*May be negative reflecting an increased cost component required to save energy and costs overall