The ITAC Statistics page displays the average assessment results for the selected criteria.
1
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $9.4k | 1.0k |
MMBtu
|
$9.21 |
- Electrical | $6.6k | 69k |
kWh
|
$0.095 |
- Natural Gas | $2.8k | 0.3k |
MMBtu
|
$9.09 |
4
Recommendations
4.0
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $8.5k | 0.8k |
MMBtu
|
81.8% |
- Electrical | $7.7k | 81k |
kWh
|
117.4% |
- Natural Gas | $0.8k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | - | |||
TOTAL | $8.5k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
1
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $9.4k | 1.0k |
MMBtu
|
$9.21 |
- Electrical | $6.6k | 69k |
kWh
|
$0.095 |
- Natural Gas | $2.8k | 0.3k |
MMBtu
|
$9.09 |
2
Implemented Recommendations
2.0
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $1.2k | 0.1k |
MMBtu
|
12.1% |
- Electrical | $1.2k | 12k |
kWh
|
17.4% |
- Natural Gas | - | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | - | |||
TOTAL | $1.2k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |