ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Repair shops and related services, not elsewhere classified
3+ Characters Required for Products

8

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $586k 38k
MMBtu
$15.26
- Electrical $394k 2,724k
kWh
$0.11
- Natural Gas $104k 9.8k
MMBtu
$9.58

70

Recommendations

8.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $324k 6.7k
MMBtu
17.6%
- Electrical $97k 649k
kWh
23.8%
- Natural Gas $15k -
MMBtu
-
Waste -
Productivity/Other $0.2k
TOTAL $324k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $665k 43k
MMBtu
$13.78
- Electrical $447k 3,095k
kWh
$0.11
- Natural Gas $118k 11k
MMBtu
$4.27

19

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $38k 3.8k
MMBtu
8.9%
- Electrical $29k 373k
kWh
12.0%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $38k
*May be negative reflecting an increased cost component required to save energy and costs overall