ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous repair shops and related services
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $384k 36k
MMBtu
$11.23
- Electrical $195k 2,406k
kWh
$0.084
- Natural Gas $115k 11k
MMBtu
$4.99

59

Recommendations

8.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $67k 5.2k
MMBtu
14.6%
- Electrical $40k 509k
kWh
21.1%
- Natural Gas $17k -
MMBtu
-
Waste -
Productivity/Other $0.2k
TOTAL $67k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $384k 36k
MMBtu
$11.23
- Electrical $195k 2,406k
kWh
$0.084
- Natural Gas $115k 11k
MMBtu
$4.99

21

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $36k 3.8k
MMBtu
10.7%
- Electrical $27k 372k
kWh
15.5%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $36k
*May be negative reflecting an increased cost component required to save energy and costs overall