ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous repair services
3+ Characters Required for Products

10

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $510k 33k
MMBtu
$14.81
- Electrical $342k 2,457k
kWh
$0.11
- Natural Gas $85k 8.0k
MMBtu
$10.72

79

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $264k 5.7k
MMBtu
17.2%
- Electrical $81k 559k
kWh
22.8%
- Natural Gas $12k -
MMBtu
-
Waste -
Productivity/Other $0.2k
TOTAL $264k
*May be negative reflecting an increased cost component required to save energy and costs overall

8

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $616k 40k
MMBtu
$13.90
- Electrical $415k 2,917k
kWh
$0.11
- Natural Gas $105k 9.9k
MMBtu
$5.97

22

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $36k 3.4k
MMBtu
8.6%
- Electrical $27k 336k
kWh
11.5%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $36k
*May be negative reflecting an increased cost component required to save energy and costs overall