ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Automotive glass replacement shops
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $593k 40k
MMBtu
$14.94
- Electrical $282k 3,874k
kWh
$0.073
- Natural Gas -
-
MMBtu
-

8

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $39k 5.5k
MMBtu
13.9%
- Electrical $39k 537k
kWh
13.9%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $39k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $593k 40k
MMBtu
$14.94
- Electrical $282k 3,874k
kWh
$0.073
- Natural Gas -
-
MMBtu
-

4

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $2.7k 0.4k
MMBtu
1.0%
- Electrical $2.7k 37k
kWh
1.0%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $2.7k