ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Tire retreading and repair shops
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $317k 54k
MMBtu
$6.79
- Electrical $122k 1,903k
kWh
$0.081
- Natural Gas $135k 33k
MMBtu
$5.54

23

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $63k 6.1k
MMBtu
11.5%
- Electrical $44k 599k
kWh
31.5%
- Natural Gas $11k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $63k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $317k 54k
MMBtu
$6.79
- Electrical $122k 1,903k
kWh
$0.081
- Natural Gas $135k 33k
MMBtu
$5.54

11

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $47k 5.2k
MMBtu
9.7%
- Electrical $37k 509k
kWh
26.7%
- Natural Gas $6.4k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $47k
*May be negative reflecting an increased cost component required to save energy and costs overall