ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Automotive repair shops
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $351k 51k
MMBtu
$7.86
- Electrical $158k 2,880k
kWh
$0.065
- Natural Gas $97k 21k
MMBtu
$4.03

45

Recommendations

6.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $42k 4.8k
MMBtu
9.3%
- Electrical $30k 465k
kWh
16.1%
- Natural Gas $7.1k -
MMBtu
-
Waste -
Productivity/Other $1.8k
TOTAL $43k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $379k 55k
MMBtu
$7.97
- Electrical $176k 3,154k
kWh
$0.069
- Natural Gas $100k 22k
MMBtu
$3.66

15

Implemented Recommendations

2.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 2.7k
MMBtu
4.8%
- Electrical $19k 260k
kWh
8.3%
- Natural Gas $3.2k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $24k
*May be negative reflecting an increased cost component required to save energy and costs overall