ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Business services, not elsewhere classified
3+ Characters Required for Products

10

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $641k 69k
MMBtu
$9.45
- Electrical $423k 5,705k
kWh
$0.068
- Natural Gas $73k 9.6k
MMBtu
$6.51

68

Recommendations

6.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $71k 6.3k
MMBtu
9.1%
- Electrical $42k 615k
kWh
10.8%
- Natural Gas $17k -
MMBtu
-
Waste $0.5k
Productivity/Other $11k
TOTAL $82k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $414k 51k
MMBtu
$8.93
- Electrical $220k 3,640k
kWh
$0.066
- Natural Gas $103k 14k
MMBtu
$6.68

18

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 1.4k
MMBtu
2.8%
- Electrical $8.0k 137k
kWh
3.8%
- Natural Gas $8.4k -
MMBtu
-
Waste $0.8k
Productivity/Other $0.3k
TOTAL $19k
*May be negative reflecting an increased cost component required to save energy and costs overall