The ITAC Statistics page displays the average assessment results for the selected criteria.
2
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $135k | 15k |
MMBtu
|
$9.10 |
- Electrical | $63k | 1,283k |
kWh
|
$0.050 |
- Natural Gas | $16k | 1.7k |
MMBtu
|
$9.08 |
20
Recommendations
10.0
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $19k | 2.5k |
MMBtu
|
17.1% |
- Electrical | $13k | 248k |
kWh
|
19.3% |
- Natural Gas | $3.4k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | - | |||
TOTAL | $19k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
0
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | - | - |
MMBtu
|
- |
- Electrical | - | - |
kWh
|
- |
- Natural Gas | - | - |
MMBtu
|
- |
0
Implemented Recommendations
0.0
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | - | - |
MMBtu
|
- |
- Electrical | - | - |
kWh
|
- |
- Natural Gas | - | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | - | |||
TOTAL | - | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |