ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Industrial launderers
3+ Characters Required for Products

10

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $404k 46k
MMBtu
$9.42
- Electrical $142k 1,536k
kWh
$0.091
- Natural Gas $205k 29k
MMBtu
$7.78

73

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $101k 7.2k
MMBtu
15.7%
- Electrical $67k 699k
kWh
45.5%
- Natural Gas $21k -
MMBtu
-
Waste $4.5k
Productivity/Other $0.3k
TOTAL $105k
*May be negative reflecting an increased cost component required to save energy and costs overall

8

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $406k 48k
MMBtu
$8.85
- Electrical $146k 1,635k
kWh
$0.089
- Natural Gas $200k 31k
MMBtu
$6.95

20

Implemented Recommendations

2.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 0.6k
MMBtu
1.3%
- Electrical $9.1k 63k
kWh
3.8%
- Natural Gas $0.3k -
MMBtu
-
Waste $1.8k
Productivity/Other $24k
TOTAL $39k
*May be negative reflecting an increased cost component required to save energy and costs overall