ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Power laundries, family and commercial
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $716k 86k
MMBtu
$9.37
- Electrical $296k 2,326k
kWh
$0.11
- Natural Gas $411k 62k
MMBtu
$8.33

17

Recommendations

5.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $103k 3.1k
MMBtu
3.7%
- Electrical $38k 307k
kWh
13.2%
- Natural Gas $64k -
MMBtu
-
Waste $2.7k
Productivity/Other $3.5k
TOTAL $110k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $716k 86k
MMBtu
$9.37
- Electrical $296k 2,326k
kWh
$0.11
- Natural Gas $411k 62k
MMBtu
$8.33

12

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $40k 2.8k
MMBtu
3.3%
- Electrical $34k 276k
kWh
11.9%
- Natural Gas $4.8k -
MMBtu
-
Waste $2.7k
Productivity/Other $3.5k
TOTAL $46k
*May be negative reflecting an increased cost component required to save energy and costs overall