ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Personal services
3+ Characters Required for Products

20

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $547k 59k
MMBtu
$10.32
- Electrical $259k 2,743k
kWh
$0.096
- Natural Gas $206k 30k
MMBtu
$6.76

149

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $112k 7.5k
MMBtu
12.7%
- Electrical $66k 727k
kWh
26.5%
- Natural Gas $30k -
MMBtu
-
Waste $24k
Productivity/Other $2.0k
TOTAL $139k
*May be negative reflecting an increased cost component required to save energy and costs overall

17

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $556k 61k
MMBtu
$10.23
- Electrical $280k 2,951k
kWh
$0.096
- Natural Gas $196k 30k
MMBtu
$6.26

60

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 2.7k
MMBtu
4.5%
- Electrical $26k 266k
kWh
9.0%
- Natural Gas $1.7k -
MMBtu
-
Waste $24k
Productivity/Other $14k
TOTAL $72k