ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Hotels and motels
3+ Characters Required for Products

25

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $533k 59k
MMBtu
$12.16
- Electrical $291k 4,556k
kWh
$0.086
- Natural Gas $104k 12k
MMBtu
$8.19

142

Recommendations

5.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $79k 5.7k
MMBtu
9.6%
- Electrical $52k 556k
kWh
12.2%
- Natural Gas $19k -
MMBtu
-
Waste $3.2k
Productivity/Other $1.0k
TOTAL $83k
*May be negative reflecting an increased cost component required to save energy and costs overall

14

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $658k 85k
MMBtu
$10.17
- Electrical $380k 6,601k
kWh
$0.081
- Natural Gas $128k 17k
MMBtu
$6.22

37

Implemented Recommendations

2.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $35k 3.6k
MMBtu
4.2%
- Electrical $28k 351k
kWh
5.3%
- Natural Gas $4.6k -
MMBtu
-
Waste $0.1k
Productivity/Other $1.9k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall