ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Real estate agents and managers
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $67k 6.4k
MMBtu
$10.48
- Electrical $9.8k 66k
kWh
$0.15
- Natural Gas $53k 5.7k
MMBtu
$9.33

3

Recommendations

3.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 0.1k
MMBtu
2.3%
- Electrical $2.1k 14k
kWh
21.2%
- Natural Gas $19k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $22k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $67k 6.4k
MMBtu
$10.48
- Electrical $9.8k 66k
kWh
$0.15
- Natural Gas $53k 5.7k
MMBtu
$9.33

2

Implemented Recommendations

2.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $2.6k 0.1k
MMBtu
2.2%
- Electrical $2.1k 14k
kWh
21.1%
- Natural Gas $0.3k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $2.6k
*May be negative reflecting an increased cost component required to save energy and costs overall