ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Operators of nonresidential buildings
3+ Characters Required for Products

8

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $99k 11k
MMBtu
$10.49
- Electrical $71k 1,003k
kWh
$0.081
- Natural Gas $6.3k 0.7k
MMBtu
$6.73

33

Recommendations

4.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $15k 1.3k
MMBtu
12.2%
- Electrical $9.4k 131k
kWh
13.1%
- Natural Gas $4.3k -
MMBtu
-
Waste $0.2k
Productivity/Other $0.2k
TOTAL $15k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $43k 3.2k
MMBtu
$13.50
- Electrical $20k 195k
kWh
$0.097
- Natural Gas $14k 1.2k
MMBtu
$15.07

6

Implemented Recommendations

2.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $12k 0.2k
MMBtu
4.8%
- Electrical $1.4k 15k
kWh
7.6%
- Natural Gas $10k -
MMBtu
-
Waste -
Productivity/Other $0.2k
TOTAL $12k