The ITAC Statistics page displays the average assessment results for the selected criteria.
7
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $77k | 7.8k |
MMBtu
|
$11.85 |
- Electrical | $41k | 635k |
kWh
|
$0.092 |
- Natural Gas | $13k | 1.3k |
MMBtu
|
$10.44 |
39
Recommendations
5.6
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $31k | 2.2k |
MMBtu
|
28.4% |
- Electrical | $18k | 216k |
kWh
|
34.0% |
- Natural Gas | $6.2k | - |
MMBtu
|
- |
Waste | $1.1k | |||
Productivity/Other | $1.0k | |||
TOTAL | $34k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
4
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $105k | 11k |
MMBtu
|
$12.34 |
- Electrical | $46k | 895k |
kWh
|
$0.072 |
- Natural Gas | $21k | 1.9k |
MMBtu
|
$13.38 |
12
Implemented Recommendations
3.0
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $27k | 1.6k |
MMBtu
|
14.5% |
- Electrical | $6.8k | 157k |
kWh
|
17.5% |
- Natural Gas | $9.2k | - |
MMBtu
|
- |
Waste | $2.0k | |||
Productivity/Other | - | |||
TOTAL | $29k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |