ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Real estate
3+ Characters Required for Products

33

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $156k 15k
MMBtu
$10.31
- Electrical $96k 1,241k
kWh
$0.085
- Natural Gas $17k 2.5k
MMBtu
$5.96

187

Recommendations

5.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $57k 4.7k
MMBtu
31.0%
- Electrical $37k 460k
kWh
37.1%
- Natural Gas $4.6k -
MMBtu
-
Waste $0.4k
Productivity/Other $3.8k
TOTAL $61k
*May be negative reflecting an increased cost component required to save energy and costs overall

23

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $171k 15k
MMBtu
$11.03
- Electrical $102k 1,235k
kWh
$0.089
- Natural Gas $20k 2.6k
MMBtu
$7.14

68

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $19k 1.3k
MMBtu
8.6%
- Electrical $10k 128k
kWh
10.4%
- Natural Gas $2.7k -
MMBtu
-
Waste $0.3k
Productivity/Other $1.5k
TOTAL $20k
*May be negative reflecting an increased cost component required to save energy and costs overall