ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Real estate
3+ Characters Required for Products

21

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $180k 16k
MMBtu
$11.19
- Electrical $109k 1,302k
kWh
$0.092
- Natural Gas $20k 2.6k
MMBtu
$7.15

125

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $72k 5.9k
MMBtu
36.9%
- Electrical $49k 572k
kWh
44.0%
- Natural Gas $4.7k -
MMBtu
-
Waste $0.6k
Productivity/Other $6.0k
TOTAL $78k
*May be negative reflecting an increased cost component required to save energy and costs overall

14

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $121k 12k
MMBtu
$10.90
- Electrical $68k 887k
kWh
$0.089
- Natural Gas $26k 3.3k
MMBtu
$8.04

40

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 1.2k
MMBtu
9.3%
- Electrical $8.3k 112k
kWh
12.7%
- Natural Gas $3.2k -
MMBtu
-
Waste $0.6k
Productivity/Other $2.3k
TOTAL $19k