The ITAC Statistics page displays the average assessment results for the selected criteria.
1
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $724k | 55k |
MMBtu
|
$13.13 |
- Electrical | $349k | 5,379k |
kWh
|
$0.065 |
- Natural Gas | - | - |
MMBtu
|
- |
8
Recommendations
8.0
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $80k | 6.7k |
MMBtu
|
12.2% |
- Electrical | $43k | 654k |
kWh
|
12.2% |
- Natural Gas | - | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $28k | |||
TOTAL | $107k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
0
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | - | - |
MMBtu
|
- |
- Electrical | - | - |
kWh
|
- |
- Natural Gas | - | - |
MMBtu
|
- |
0
Implemented Recommendations
0.0
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | - | - |
MMBtu
|
- |
- Electrical | - | - |
kWh
|
- |
- Natural Gas | - | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | - | |||
TOTAL | - | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |