ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous shopping goods stores
3+ Characters Required for Products

9

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $288k 31k
MMBtu
$9.13
- Electrical $211k 2,892k
kWh
$0.075
- Natural Gas $14k 1.8k
MMBtu
$8.06

53

Recommendations

5.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $54k 6.0k
MMBtu
19.1%
- Electrical $41k 584k
kWh
20.2%
- Natural Gas $1.3k -
MMBtu
-
Waste -
Productivity/Other $0.1k
TOTAL $54k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $288k 31k
MMBtu
$9.13
- Electrical $211k 2,892k
kWh
$0.075
- Natural Gas $14k 1.8k
MMBtu
$8.06

24

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 3.2k
MMBtu
10.1%
- Electrical $25k 310k
kWh
10.7%
- Natural Gas $0.6k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $28k
*May be negative reflecting an increased cost component required to save energy and costs overall