ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous retail
3+ Characters Required for Products

11

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $263k 29k
MMBtu
$9.14
- Electrical $189k 2,692k
kWh
$0.075
- Natural Gas $11k 1.5k
MMBtu
$6.59

80

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $58k 7.1k
MMBtu
24.3%
- Electrical $44k 688k
kWh
25.6%
- Natural Gas $1.0k -
MMBtu
-
Waste $0.8k
Productivity/Other $6.9k
TOTAL $66k
*May be negative reflecting an increased cost component required to save energy and costs overall

11

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $263k 29k
MMBtu
$9.14
- Electrical $189k 2,692k
kWh
$0.075
- Natural Gas $11k 1.5k
MMBtu
$6.59

35

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 3.9k
MMBtu
13.4%
- Electrical $27k 379k
kWh
14.1%
- Natural Gas $0.5k -
MMBtu
-
Waste $0.8k
Productivity/Other $4.1k
TOTAL $36k
*May be negative reflecting an increased cost component required to save energy and costs overall