ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Drinking places (alcoholic beverages)
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $51k 3.2k
MMBtu
$16.20
- Electrical $5.5k 181k
kWh
$0.030
- Natural Gas $12k 1.3k
MMBtu
$9.35

4

Recommendations

4.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $3.8k 0.2k
MMBtu
5.0%
- Electrical $0.5k 15k
kWh
8.5%
- Natural Gas $1.3k -
MMBtu
-
Waste -
Productivity/Other $6.6k
TOTAL $10k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $51k 3.2k
MMBtu
$16.20
- Electrical $5.5k 181k
kWh
$0.030
- Natural Gas $12k 1.3k
MMBtu
$9.35

3

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $3.3k -
MMBtu
-
- Electrical -
-
kWh
-
- Natural Gas $1.3k -
MMBtu
-
Waste -
Productivity/Other $6.5k
TOTAL $9.8k
*May be negative reflecting an increased cost component required to save energy and costs overall