ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Motor vehicle dealers (new and used)
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $329k 66k
MMBtu
$8.92
- Electrical $279k 2,404k
kWh
$0.11
- Natural Gas $37k 42k
MMBtu
$2.98

22

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $37k 2.9k
MMBtu
4.3%
- Electrical $35k 282k
kWh
11.7%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $62k
TOTAL $99k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $378k 32k
MMBtu
$12.52
- Electrical $370k 3,119k
kWh
$0.12
- Natural Gas $1.9k 0.2k
MMBtu
$4.05

3

Implemented Recommendations

1.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $5.4k 0.5k
MMBtu
1.4%
- Electrical $5.4k 44k
kWh
1.4%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $5.4k
*May be negative reflecting an increased cost component required to save energy and costs overall